Erosion control & hydroseeding in Arkansas.
Utility-scale solar and large sitework across Arkansas: silt fence and perimeter controls to the state detail, hydroseeding with FGM and BFM on the slopes, SWPPP maintenance through the job.

The permit, the dirt, and what we've done there.
Permit. ADEE's construction stormwater general permit (ARR150000) sets the SWPPP, inspection and stabilization requirements; a reissued permit takes effect November 2026.
Soils. Delta silts and clays in the east hold water and crust; stony Ozark and Ouachita uplands in the northwest and west are shallow and steep. Product by slope: FGM on the steep ground, mulch and quick seed on the flats.
Work. Arkansas is part of our service area. Crews travel and run on our own trucks, so an Arkansas site is a drive, not a subcontract. See recent sites.
Everything stormwater on a Arkansas site.
Silt fence and perimeter controls installed to the state detail before grading. Hydroseeding with Flexterra HP-FGM, BFM or hydraulic mulch by slope, temporary and permanent. SWPPP maintenance and post-storm repairs through the job. Transport of our own equipment, and yours when a truck is free.
To the state detail. Installed, maintained, removed.
Product by slope. Applied per manufacturer spec.
Post-storm corrective actions with a photo record.
Takeoff from the civil set, release by lookahead.
Have a site in Arkansas?
Send the civil set. We'll measure it and come back with a number by area.
